Bell Bank
Beauty and flexibility to meet evolving needs
Location
DIRTT Construction Partner
Designer
General Contractor
Bell Bank was looking for a flexible solution for their evolving company needs. Something that was functional and welcoming. With DIRTT they got both.
Product Spotlight
Project Includes:
Custom veneer panels bring warmth to the space while Breathe® Walls bring a living pop of color. Switch glass walls can change from transparent to opaque for privacy with the flick of a switch. And then there’s the stuff you can’t see. DIRTT quick-connect power running through the walls supports embedded monitors and room-booking technology. All of it is manufactured off-site for quick and clean installation. That meant that when Bell Bank ran into delays during renovation, DIRTT modular construction helped them meet their project deadlines.
Without the DIRTT solution, we wouldn’t have been able to meet our project deadline.
Carrie Nett
Vice President, Facilities, Bell Bank
01
PLAN
Discover how DIRTT can bring the most value to your project.
02
TRANSLATE
Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.
03
MANUFACTURE
With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.
04
INSTALL
DIRTT components are rapidly installed on a clean job site with less waste.
05
ADAPT
Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.
Ready to get started?
Connect with a DIRTT construction specialist to bring your next project to life.