University Medical Center
Keeping this emergency department ahead of schedule
Location
SQ FT
Architect
General Contractor
Built in the 1950s, University Medical Center (UMC) has a long history in Las Vegas. To carry on their legacy, they needed to update the emergency department. They wanted a good-looking, durable environment that also featured exceptional fit and finish. That’s part of what drew them to DIRTT. Our precision-manufactured interiors gave them the control they needed while still working within their budget.
Product Spotlight
Project Includes:
UMC knows the patient experience is the key to operating a world-class hospital. As the closest medical center to the strip, many of their clientele are tourists. Incorporating graphics on DIRTT panels enabled them to create a welcoming space for visitors that also improved infection prevention and control.
During construction, UMC decided to make a change. With DIRTT, flexibility is built in so adapting on the fly is always an option. In order to accelerate construction, they decided to use DIRTT Flex Gas. Manufacturing walls with medical gas lines already installed meant the project was completed eight months faster. The UMC emergency department was saving lives almost a year sooner than they would have with conventional construction.
01
PLAN
Discover how DIRTT can bring the most value to your project.
02
TRANSLATE
Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.
03
MANUFACTURE
With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.
04
INSTALL
DIRTT components are rapidly installed on a clean job site with less waste.
05
ADAPT
Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.
Ready to get started?
Connect with a DIRTT construction specialist to bring your next project to life.