Medical Office Building

Shaving valuable time off a healthcare construction schedule

  • Location

    Hesperia, California

  • SQ FT

    52,000

  • Architect

    Cannon Design Inc.

  • Designer

    Cannon Design Inc.

  • General Contractor

    McCarthy Building Companies Inc.

Image Credit: © Laura Peters / CannonDesign

How do you cut the schedule on a massive healthcare construction project by 30%? That was the question posed by a health system to a group of stakeholders when they began work on a new medical office building. There was a huge business case to be made for saving time and money on the build and getting into the market faster. But not just on this project. On all the subsequent builds they were undertaking across their health system.

To do that, the health system worked with a handful of like-minded partners to develop an easily replicated construction program. Relying on a standardized building plan and pre-manufactured construction, they set out to complete a typical 36-month build in 30 months or less.

Product Spotlight

Scroll horizontally to move
the image

Project Includes:

With modular floor plans, a kit of parts, and prefabricated interiors and exteriors, the team was able to shift from a stick-built construction model to one where components were easily assembled on-site. The DIRTT construction system was one part of this. Leveraging the precision of off-site manufacturing, DIRTT rapidly delivered durable, code-compliant interiors with the level of fit and finish required in a high-performance medical office building. Working together, DIRTT and the health system were able to reduce risk and cost while improving quality and accelerating the schedule.

In the end, this next-generation medical office building was completed in just 23 months. This medical office building is a testament to spaces created using prefabricated construction and the partnerships that bring them to life.

    01

    PLAN

    Discover how DIRTT can bring the most value to your project.

    02

    TRANSLATE

    Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

    03

    MANUFACTURE

    With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

    04

    INSTALL

    DIRTT components are rapidly installed on a clean job site with less waste.

    05

    ADAPT

    Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.