EvergreenHealth Progressive Care Unit
Agility to minimize downtime
Location
SQ FT
Architect
General Contractor
To create a space that would serve their patients, EvergreenHeath knew that wall access was critical. They needed to keep their 62-bed progressive care unit current with the latest smart room technology. And they wanted quick and easy maintenance. Why? Each critical-care headwall in these patient rooms include more than 50 electrical, data and medical gas service drops. With DIRTT, each service drop was installed before the headwall ever arrived on-site. That kept the plenum above the ceiling open for mechanical, electrical, and plumbing. Future maintenance and changes become much easier as a result.
Product Spotlight
Project Includes:
Embedding technology inside the wall under easy-to-clean surfaces improved infection prevention and control. But more importantly the inside of the wall could be easily accessed. Wall-mounted equipment could be shifted in a flash. Durable removable panels mean that drywall repairs have been reduced to zero. Overall, maintenance costs are expected to drop an estimated $1 million a year because rooms can stay operational.
Thank you for giving me a room that makes me feel so good when I feel so sick.
EvergreenHealth Patient
01
PLAN
Discover how DIRTT can bring the most value to your project.
02
TRANSLATE
Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.
03
MANUFACTURE
With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.
04
INSTALL
DIRTT components are rapidly installed on a clean job site with less waste.
05
ADAPT
Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.
Ready to get started?
Connect with a DIRTT construction specialist to bring your next project to life.