University of the Fraser Valley – Building K

Active learning meets proactive construction

  • Location

    Abbotsford, British Columbia

  • SQ FT

    18,240

  • DIRTT INSTALL

    2 weeks

  • Architect

    Chernoff Thompson Architects

  • General Contractor

    Chandos Construction

Image Credit: Ed White Photographics/Chernoff Thompson Architects

Some people thought the University of the Fraser Valley couldn’t do it. Students couldn’t see how the old campus pub could be a meaningful learning space. Stakeholders weren’t sure the renovation would be completed on time. But this school wasn’t going to let that stand in the way of putting their students first.

Let’s rewind. In 2018, UFV needed a swing space to handle displaced students and faculty from another construction project. They bought a nearby restaurant and got ready to convert it into classrooms and admin offices. But they only had a year to do it. Design a building, gut the campus pub, and get an active-learning student space ready for fall 2019. Conventional construction couldn’t meet that deadline, but with DIRTT they could do it all.

Product Spotlight

Scroll horizontally to move
the image

Project Includes:

Using prefabricated construction meant that as the mechanical, electrical and plumbing were being roughed in, the classrooms were being built off-site. Having both these things happen at the same time cut weeks from the schedule. Once the base building was ready, the walls went up in no time. And these aren’t only partitions to separate rooms. The walls had vibrant colors, integrated tech and 10-foot windows to let the light in. Writable surfaces in every classroom support teachers and students in their active-learning plan.

But Building K isn’t just a space for today. It’s a space that can adapt for tomorrow. The next time the University of the Fraser Valley needs to renovate, they’re ready. UFV can reconfigure DIRTT and customize their learning spaces.

Learn more about UFV's approach to a active learning here.

DIRTT and this technology today allows us to make a substantial difference to the learners of the future.

Mark Goudsblom

Director of campus planning and facilities management, University of the Fraser Valley

    01

    PLAN

    Discover how DIRTT can bring the most value to your project.

    02

    TRANSLATE

    Your design is translated into DIRTT components. You’re empowered with real-time feedback to make faster decisions.

    03

    MANUFACTURE

    With software connecting directly to DIRTT factories, every element of your DIRTT space is precision manufactured within 21 days.

    04

    INSTALL

    DIRTT components are rapidly installed on a clean job site with less waste.

    05

    ADAPT

    Your agile DIRTT space is built to evolve with you. DIRTT components embrace change for a future-friendly space.